Yesterday the ceiling was plastered where they took out the asbestos. Still drying.
It was actually about half of that section, but the blendedit with the rest covering all of that side.
Now to get everything put back so I can get back to work. I expect I will probably cull a lot of things! The cupboards and wardrobe have swapped places. That way I can access the cupboards easier. I use the wardrobe more like storage ,so it can be behind the cutting table where access is a bit more difficult.
AND I can bring my gowns back downstairs via the lift😁! No tripping on the stairway!
No comments:
Post a Comment
Thanks for comments. I do read them and comment when I can.
Apologies in advance if I don't get to reply though.
Thanks,
Sandy
PS If you are set to "noreply blogger" Unless I know your actual email address, I can't reply to your comment.